Description:
Modern construction projects both large and small are complex endeavors, involving many products, systems, and often-disparate players. The coordination and assembly of all the necessary elements at a site is almost impossible to achieve without extensive up-front planning and scheduling. The primary objective of this course is to introduce principles of network scheduling and its potential impact on project success and delay. The second objective of this seminar is to provide a hands-on workshop environment where attendees will have an opportunity to work in pairs to create a simple CPM schedule based upon predetermined criteria and to discuss the issues involved such as manpower loading curves. Ample time is given for discussion of problems encountered in using or preparing a CPM schedule. Although computer applications will be discussed, the workshop program involves a basic hand-drawn logic diagram and schedule activities. Additional topics covered in this seminar include resource leveling (labor), achieving optimum level of workers, building a manpower loading from the CPM schedule, determine optimum project duration and build S-curve.
Speaker: Dr. Awad Hanna

Daily Agenda
Cost
If eligible, the $99 educational subsidy will be applied for Wisconsin Chapter members. This will be reimbursed via check after the seminar.
Location: Hilton Garden Inn Sun Prairie
1220 South Grand Ave
Sun Prairie, WI 53590
Hotel Room Block
A hotel room block is reserved for September 23-24, 2026, so you can arrive the night before the course begins.
Rate: $159.00 Standard Rate - 1 King Bed
If you'd like to reserve a room for this event, please book here: https://www.hilton.com/en/attend-my-event/msnspgi-92t-9ff8c3a1-75a7-475f-86c1-c0db25089341/
The room block will expire on 9/10/2026.
Cancellation Policy
There is no charge for cancellations made by 9/11/2026. A 50% charge applies for cancellations made between 9/12/2026 and 9/16/2026. Cancellations made between 9/17/2026 and 9/24/2026, as well as no-shows, will be charged the full registration price — $400 for Wisconsin Chapter NECA members, $550 for non-members. Attendee substitutions are welcome at any time.
Code of Conduct
By attending this event, you agree to abide by all National Electrical Contractors Association Code of Conduct rules, etiquette, and privacy guidelines, as well as the NECA & ELECTRI International Events Code of Conduct.
WI NECA Members $400
Non-Members $550
Located conveniently off of I90/94 and Hwy 151.